How Long Does a Line Marking Project Take?

If you’re planning new line markings for a car park, warehouse, or public space, you might be wondering: “How long will the job actually take?”
It’s a common question — and the answer depends on several factors, including the type of markings, the materials used, and the size of the site. At C&R Ltd, we complete projects of all sizes across the UK, always aiming to deliver fast, efficient results with minimal disruption.
Factors That Affect Project Duration.
Size and Complexity of the Area
Smaller car parks or warehouse sections can often be completed in a single day, while larger or more complex layouts — such as multi-level car parks or full road networks — may take longer.
Type of Material Used
- Thermoplastic markings cool and set within minutes, meaning areas can reopen quickly.
- MMA resin may take up to an hour to fully cure but provides excellent durability.
- Paint-based systems can require longer drying times, depending on temperature and humidity.
Surface Condition and Preparation
If the surface needs cleaning, repairs, or old markings removed first, that adds time — but it also ensures a better, longer-lasting result.
Weather Conditions
For outdoor work, weather plays a key role. Rain or cold temperatures can delay application, particularly for thermoplastic or water-based paints. At C&R Ltd, we monitor forecasts carefully and schedule work during the most suitable conditions.
Typical Timeframes.
Here’s a general idea of how long different projects might take:
- Small car parks: A few hours to a single day.
- Medium commercial sites: One to two days.
- Large warehouses or multi-site works: Two to five days, depending on layout.
- Road marking projects: Varies by scale, often scheduled in sections to minimise disruption.
Our team always works efficiently while maintaining the highest safety and quality standards.
Minimising Disruption to Your Business.
At C&R Ltd, we understand that downtime means lost productivity. That’s why we:
- Offer out-of-hours and overnight work to keep your site open.
- Use fast-curing materials to reduce waiting times.
- Plan projects carefully to complete sections in phases if needed.
This approach ensures your operations continue smoothly while we deliver professional results.
Why Choose C&R.
As one of the UK’s leading specialists in line marking, surface preparation, coatings, and cleaning, C&R delivers expert advice, professional results, and long-lasting performance nationwide.
Over 30 Years’ Experience
Trusted nationwide by major brands and local authorities.
Fully Accredited & Insured
Working to UK safety and environmental standards.
Complete Start-to-Finish Service
From design and preparation to marking and aftercare.
Nationwide Coverage
Responsive teams operating across England, Scotland, and Wales.