When it comes to executing complex projects, efficiency, flexibility, and reliability are crucial. Thatโs where multiphase contract delivery comes into play. At CR Ltd, we pride ourselves on providing tailored, 24/7 multiphase contract services that suit the unique...
Clean and Retrieve – Project
Manchester Airport Anti-Slip Markings
Project Overview
We were presented with a unique challenge at the Manchester Airport Bus Depot: a floor that became a safety hazard when wet. This issue was not only a risk to the staff but also to the operational efficiency of the airport's bus depot.
Utilising our expertise in anti-slip flooring solutions, we applied a specially formulated anti-slip concrete to the depot's floor. This improved the surface's traction, significantly reducing the risk of accidents, even in wet conditions.
In addition to enhancing safety, we took the opportunity to boost the depot's operational efficiency and aesthetics. We integrated coloured walkways within the new flooring design, serving as intuitive guides for foot traffic while also freshening up the overall look of the depot.
Project Categorisation
Enquire with C&R today
Recent blogs by C&R
How Do You Maximise Space and Safety with Car Park Line Marking?
When designing or re-marking a car park, itโs crucial to balance maximising space and ensuring safety. Professional line marking plays a key role in optimising layout, traffic flow, and pedestrian safety. But how can you ensure your car park is efficiently designed?...
Why is Line Marking maintenance so important?
In industrial environments, efficiency and safety are paramount. A well-organised and clearly marked space can dramatically improve both. Line markings help guide traffic, ensure equipment is stored in the right places, and designate areas that require special...
Start your next project with us.